"Their field and office managers have been excellent communicators, and they have first-class, personnel. We would recommend
Hemsec Installations and their staff as conscientious, attentive, and professional."
Fabián Iglesias Ladeve´ze - Ferrovial Agromán - Educo UK
"Thank you very much for your work and honesty with me throughout this year and it´s been a pleasure working with you."
Jim McVeigh - Director - McVeigh Insulations
Andy Smythe- Director - Creative Space
"From the ground breaking to the dedication, I found Hemsec Installations to be an effective, professional organization which
delivered on its promises. Everyone associated with Hemsec were responsive and accessible to our staff and design professionals.
I would recommend Hemsec Installations for any commercial or public construction project...."
"Further to the very successful completion of the Gazeley, Crick scheme, I would like to pass on my personal thanks to you and
your team for helping us achieve an excellent result and look forward to working with yourselves in the very near future."
D.Horton - Regional Director - B&K Structures
Colin Horrocks, Commercial Director -
Hemsec installations
Additional Services:
t: 0151 426 7171
Please see our project pages:
Hemsec Installations Ltd
Stoney Lane,
Rainhill,
Prescot,
Merseyside.
L35 9LL
Tel : 0151 426 7171
Fax: 0151 431 0800
Testimonials
f: 0151 431 0800
James Glover, Design Manager -
Hemsec installations
Copyright © 2012 Hemsec Installations Limited. All rights reserved
Welcome to the revolution.
Thru-Wall, a collaboration between Lakesmere and Hemsec Installations, two of the most respected names in the construction industry,
offers a unique, modular, fast-track, lightweight, sustainable and cost-effective means of constructing the building envelope up to five times
faster than traditional construction methods and is the first UK business to offer full, latent defect 20-year SIPS/external finish insurance
cover. Load bearing and pre-insulated, Thru-Wall is up to five times faster to install than traditional construction methods, combining the
engineering and environmental benefits of off-site manufacture with enhanced performance including superior thermal and structural
properties. Fenestration, glazing and external finishes can be factory or site installed, ideal for commercial projects where quality and speed
of construction are paramount.
follow us on:
Saul Slater Consulting Engineers.
Hemsec Installations also has the added benefit of it’s consulting engineering division, headed up by Saul Slater (SSCE). SSCE are an
independant division created to undertake all aspects of structural engineering. Saul has a BEng in Structural Engineering from the University of
Manchester, is a chartered structural engineer (MIStructE) and has an MSc in Construction Law from the University of Central Lancashire. SSCE
specialise in structural design, specialist structures (inc.SIPS), expert structural advice, modular buildings and civil engineering. For further advice
please contact Saul on Tel: 0151 432 7550 or email saul@saulslater.com.